Lemken Karat 9 K / KU intensive cultivator service schedule
Cultivators and power harrows · Manual 175_4353, edition 04 / 07.2021
Covers the Lemken Karat 9 K / KU intensive cultivator (with hollow discs and automatic tine overload protection). Karat 9 and 9 U: check your handbook.
Every maker's service job for the Lemken Karat 9 K / KU intensive cultivator, counted in hours, with the oils, filters and parts each one needs. Add your implement to Farmyard Workshop and it works out what's due from your hours and dates, and keeps the service history.
Track your Karat 9 K / KU intensive cultivator for freeVersions: Karat 9 K; Karat 9 KU
Service intervals
| Job | When |
|---|---|
| Re-tighten wheel nuts and bolts after the first 2 hours | every 2 hours |
| Daily check: tyres, hoses, safety equipment and tools | every 10 hours |
| Share tips, wing shares and guide plates | every 10 hours |
| Greasing (folding pins and joints) | every 50 hours or every year |
| Weekly check: wheel nuts and screw connections | every 50 hours |
| Tine shear bolt and share position | every year |
| Hollow discs and side shields | every year |
| End-of-season lay-up | every year |
Service jobs and parts
Re-tighten wheel nuts and bolts after the first 2 hours
Frame · every 2 hours
Lemken says to retighten the wheel nuts and all other bolts at the latest after the first 2 hours of work.
Step-by-step
- Tighten the wheel nuts to the torque for your thread size (M18 × 1.5 290 Nm, M20 × 1.5 380 Nm, M22 × 1.5 510 Nm).
- Retighten every other nut and bolt to the torque table in your handbook.
Tools: Torque wrench, Socket set
Daily check: tyres, hoses, safety equipment and tools
Frame · every 10 hours
Lemken's daily inspection covers the tyres, hydraulic hoses, safety equipment and every soil-working tool. Hoses must be replaced 6 years after manufacture.
| Part | Qty | Notes | Part number |
|---|---|---|---|
| Hydraulic hose | 1 | Lemken-approved only | check your handbook |
Step-by-step
- Check the tyres for damage and wear and the pressure (2.6–2.8 bar on the 10.0/80-12).
- Check the hoses for damage and leaks and replace any over 6 years old.
- Check that all safety devices work.
- Check every tine, share, disc and tool for wear and damage. Replace damaged or worn parts.
Tools: Tyre gauge, Torch
Share tips, wing shares and guide plates
Wear parts · every 10 hours
Share tips and wing shares set the working depth and the full-surface cut. Lemken offers armoured versions with a much longer life. The share base with tip, plate and wing weighs about 12 kg.
| Part | Qty | Notes | Part number |
|---|---|---|---|
| Goosefoot share, 200 mm | 1 | Genuine Lemken, 200 mm wide, 6 mm steel, listed by Partao for Karat 9. Per tine; check which share your tines carry | 33720002 |
| Share tip | 1 | Per tine. Standard or armoured. Genuine Lemken, check your parts book | check your handbook |
| Wing share | 1 | Per tine. Standard or armoured. Genuine Lemken, check your parts book | check your handbook |
| Guide plate | 1 | Per tine. Genuine Lemken, check your parts book | check your handbook |
Step-by-step
- Lift the machine about 20 cm, secure it with a support, lock the tractor controls and switch off the engine.
- On quick-change tines, use the Lemken hook wrench to swivel the wire of the linch pin back, press the guide plate up against the tine, pull the pin and swing the share base forward and off. It weighs about 12 kg.
- On fixed tines, screw the point, guide plate and wing shares to the tine with the screws, to the torque table.
- Refit in reverse and recheck all fixings.
Tools: Torque wrench, Lemken hook wrench, Lifting support
Greasing (folding pins and joints)
Lubrication · every 50 hours or every year
Lemken says to grease the pins in the folding cylinders and the folding joints every 50 hours, and before and after the winter break, with Olistamoly 2 or an equivalent grease.
| Part | Qty | Notes | Part number |
|---|---|---|---|
| Olistamoly 2 grease | 1 | Or equivalent high-quality grease | check your handbook |
Step-by-step
- Stop the tractor and take the key out. Wear goggles: grease can escape at high pressure.
- Grease the pins in the folding cylinders (a), the pins in the folding joints (b) and the hole in the joint (c), as the chart in your handbook shows.
- Grease again before and after the winter break.
Tools: Grease gun, Rags
Weekly check: wheel nuts and screw connections
Frame · every 50 hours
Lemken's weekly check is wheel nuts and bolts. Use thread locker where the handbook says so.
Step-by-step
- Check all wheel nuts are tight and retighten to the right torque.
- Retighten all other bolts and nuts to the torque in the table and secure with locking compound where required.
Tools: Torque wrench
Tine shear bolt and share position
Leg protection · every year
On tines protected by shear bolts, the same bolt sets the share angle: shallow for deep work or a steep position for hard, dry soil. Lemken says to set all tines the same and tighten the bolt to 113 Nm.
| Part | Qty | Notes | Part number |
|---|---|---|---|
| Shear bolt | 1 | Genuine Lemken only. Part number: check your handbook | check your handbook |
Step-by-step
- Raise the implement a few centimetres and secure it so it cannot drop.
- Slacken the nut on the shear bolt and remove it. Knock the bolt out with a suitable drift.
- Pivot the tine to the share position needed, put the bolt through the shallow or steep hole and tighten the nut to 113 Nm.
- Set every tine to the same position. Never leave a shear bolt out: the tine can swing freely and cause injury.
Tools: Spanner, Torque wrench, Drift
Hollow discs and side shields
Wear parts · every year
Worn discs have sharp edges. Lemken gives the torque for refitting: 46 Nm for hollow disc bolts and 80 Nm for side shields, both with new self-locking nuts.
| Part | Qty | Notes | Part number |
|---|---|---|---|
| Hollow disc | 1 | Genuine Lemken. Check your parts book | check your handbook |
| Side shield | 1 | Genuine Lemken. Check your parts book | check your handbook |
| Self-locking nut | 6 | Per disc, new each time | check your handbook |
Step-by-step
- Unfold both side sections, raise the machine and secure it so it cannot sink.
- Clean the disc and bearing flange so no dirt gets into the bearing.
- Undo the six self-locking nuts, take the disc off, clean the flange and fit the new disc with new nuts at 46 Nm.
- Side shields: undo the two self-locking nuts, remove the shield, fit the new one with new nuts at 80 Nm.
Tools: Torque wrench, Gloves
End-of-season lay-up
Storage · every year
Lemken lists an end-of-season routine: grease the guide pins, coat the piston rods with acid-free grease, grease all surfaces that could rust and fit the caps.
| Part | Qty | Notes | Part number |
|---|---|---|---|
| Acid-free grease | 1 | To DIN 51 502 | check your handbook |
| Olistamoly 2 grease | 1 | check your handbook |
Step-by-step
- Clean the machine.
- Grease all guide pins.
- Coat all piston rods on the hydraulic cylinders with acid-free grease.
- Grease all surfaces that could rust.
- Push the protective caps onto the hydraulic and electrical connectors.
Tools: Grease gun, Pressure washer
Oils, fluids and capacities
| System | Oil or spec | Capacity |
|---|---|---|
| Grease points | Olistamoly 2 grease or an equivalent high-quality grease | |
| Cylinder rods (winter storage) | Acid-free grease to DIN 51 502 |
Specifications
| Tine shear bolt torque (share position change) | 113 Nm |
| Hollow disc nuts (six, flat-headed bolts) | 46 Nm, new self-locking nuts |
| Side shield nuts | 80 Nm, new self-locking nuts |
| Tyres 10.0/80-12 AW 8 PR | 2.6 to 2.8 bar |
| Wheel nuts | M14 125 Nm; M18 × 1.5 290 Nm; M20 × 1.5 380 Nm; M22 × 1.5 510 Nm |
| Share base with share tip, guide plate and wing share | About 12 kg (quick-change tines) |
| Hydraulic hose life | Replace 6 years after the date of manufacture |
Known problems
Never leave a tine shear bolt out
With the bolt out the tine can swing freely. Fit a new one before work.
Tine springs under tension
A tripped tine may spring back with great force: keep clear until it has returned to work.
Parts list with genuine part numbers
Wear parts per partao.com fitment (Karat 9)
Wear parts
| Part | Part number | Qty | Notes |
|---|---|---|---|
| Goosefoot share 200 mm | 33720002 | per tine | Wear part; genuine Lemken per partao, fits Karat 9 |
| Tine point (left, 250 x 20 mm) | 3364055 | per tine | Wear part; genuine Lemken per partao, fits Karat 9, 10, Kristall 9, 10, Korund 8, 9 |
| Bolt M12x40 grade 10.9 (tine fixing / shear bolt per partao) | 3014875 | per tine | Genuine Lemken per partao, fits Karat 9/300 and 9/350, Kristall 9, Smaragd 9 |
Sources
- Lemken Karat 9 goosefoot share 33720002
- Lemken Operating Instructions Intensive Cultivator Karat 9 K / KU (175_4353, 04/07.21): maintenance intervals, lubrication chart, share systems, shear bolt 113 Nm, hollow discs 46 Nm, side shields 80 Nm, tyres
- 3364055
- 3014875
More from Lemken.